Pune Metro Line 4 & 4A (2026): Every Station on the Kharadi–Khadakwasla Corridor and What It Means for Property Prices

A station-by-station look at Pune Metro Phase 2's Line 4 (Kharadi–Hadapsar–Swargate–Khadakwasla) and Line 4A (Nal Stop–Warje–Manik Baug) — real costs, real approval dates, current property prices along the route where they exist, and an honest verdict on which stations look like genuine early-mover bets versus which are still just lines on a map.

R

Roomii Editorial Team

Pune Real Estate Intelligence · roomii.in

Pune Metro Phase 2 Is Real Now — But "Real" Still Means Five-Plus Years Out

Every couple of years, someone in a Pune real estate WhatsApp group forwards a metro route map and every price in a five-kilometre radius supposedly doubles overnight. Most of the time that map is a proposal, not a project. This time it's different in one important way: Pune Metro Phase 2's Line 4 and Line 4A have actual Union Cabinet approval, an actual sanctioned cost, and an actual construction window — not just a DPR sitting in a PMRDA file.

That doesn't mean shovels are in the ground. It means the paperwork stage that most Indian metro corridors get stuck in for years has been cleared. This piece goes station by station through Line 4, Line 4A, and the corridor some earlier coverage called "Line 5" — what's confirmed, what current property prices look like along the route where that data actually exists, and where a Roomii reader should be honestly skeptical rather than hopeful.


What Actually Got Approved — And When

There are two approvals here, and conflating them is where a lot of confusion comes from.

October 2024: The Maharashtra state government approved 31.64 km of new metro route across two lines — at the time referred to in project documentation as Line-5 and Line-5's Spur. This was the state-level nod on the DPR, the step that usually happens before central government money gets involved.

Late November 2025: The Union Cabinet, chaired by the Prime Minister, approved the same physical corridor for central funding — but under a different name. In the Cabinet's own framing, this is Line 4 (Kharadi–Hadapsar–Swargate–Khadakwasla) and Line 4A (Nal Stop–Warje–Manik Baug). If you come across older coverage calling this route "Line 5," that's not a separate project — it's the same corridor under Maha-Metro's earlier internal naming, before the Union Cabinet's approval formalised it as Line 4/4A. Worth knowing so you don't think two different metro lines are being built through the same stretch of Sinhagad Road.

The numbers that matter:

  • Combined length: 31.636 km (Line 4: 25.52 km + Line 4A: 6.12 km)
  • Total stations: 28, all elevated
  • Sanctioned cost: ₹9,857.85 crore (cited elsewhere as roughly ₹9,800 crore)
  • Funding: Jointly by the Government of India, Government of Maharashtra, and external bilateral/multilateral funding agencies — exact split not publicly broken down in the approval announcements we could find
  • Construction period: Five years from the date of approval, per the Cabinet's own terms
  • Implementing agency: Maharashtra Metro Rail Corporation (Maha-Metro)

One genuinely useful signal that this isn't purely symbolic: a General Consultant — a joint venture of Egis Rail, AECOM India and Doyen Engineering Services — had already been named preferred bidder for the corridor even before the formal construction start. Consultant procurement happening ahead of the five-year clock starting is a small but real sign of institutional movement, not just a press release.

What we could not verify: a firm construction start date. "No earlier than 2026" is the most specific timeline any source would commit to as of this writing. Given the five-year construction window is pegged to the approval date (late 2025), a realistic completion window — if the schedule holds, which Indian metro schedules frequently do not — lands somewhere around 2030–2031.


Line 4: Every Station From Kharadi to Khadakwasla

This is the main corridor — 25.52 km, 22 elevated stations, running roughly southwest to northeast through some of Pune's oldest neighbourhoods before ending in its newest IT corridor.

#StationArea / BeltCurrent price/sq ft (where data exists)
1KhadakwaslaNear Khadakwasla Dam / NDA beltNo organised listing data found
2DalvewadiSmall settlement, Khadakwasla–Nanded stretchNo organised listing data found
3Nanded CityKolte-Patil's integrated township, Sinhagad Road₹12,150–12,900/sq ft (Q2 2026, up ~6.2% QoQ)
4Dhayari PhataDhayari, Sinhagad Road₹5,350–7,200/sq ft, avg. ~₹6,150
5Manik BaugSinhagad Road / Katraj link (also Line 4A's terminus)Broader Sinhagad Road corridor: ₹7,500–9,500/sq ft
6Hingane ChowkKarve Nagar–Sinhagad Road beltNo station-specific data found
7Rajaram BridgeOld Pune, near Rajaram Bridge/Sinhagad Road junctionNo organised listing data found
8Deshpande UdyanOld Pune, near Sinhagad RoadNo organised listing data found
9Dandekar PulOld Pune, riversideNo organised listing data found
10Swargate NorthSwargate₹8,100–15,150/sq ft (wide spread); recent transactions cluster near ₹13,800–14,200/sq ft
11Seven Loves ChowkCentral Pune / Camp beltNo organised listing data found
12PCBPune Cantonment Board areaNo organised listing data found
13Race CourseLargely defence/institutional land near Pune Race CourseNo organised listing data found
14Fatima NagarWanowrie beltNo organised listing data found
15RamtekdiRamtekdi industrial estateNo organised listing data found
16HadapsarHadapsarRegistered range ₹6,000–9,550/sq ft; asking prices run much higher (~₹14,500/sq ft)
17Magarpatta SouthMagarpatta City₹12,400–15,747/sq ft
18Magarpatta MainMagarpatta City₹12,400–15,747/sq ft
19Magarpatta NorthMagarpatta City₹12,400–15,747/sq ft
20Hadapsar Railway StationHadapsar, near the railway stationNo station-specific data found
21Sainath NagarHadapsar–Kharadi stretchNo organised listing data found
22Kharadi ChowkKharadi₹7,000–11,800/sq ft (Roomii's own locality range vs. a broader portal average — see note below)

Roughly half of Line 4's 22 stations sit in areas with no organised, reliable per-sq-ft price data at all. That's not a gap in our research — it's a reflection of reality. Old Pune neighbourhoods like Deshpande Udyan, Dandekar Pul and Rajaram Bridge, cantonment-adjacent land around PCB and Race Course, and the industrial belt around Ramtekdi simply don't have the resale/listing volume that portals track in the same way Kharadi or Magarpatta do. That itself is a useful data point for anyone thinking about "metro premium" — a lot of this line runs through areas that aren't primarily residential markets today, which changes the appreciation story from "existing housing gets a metro bump" to "undeveloped or under-utilised land gets a reason to be redeveloped," a much longer and less certain play.


Line 4A: The Nal Stop–Warje–Manik Baug Spur

Six elevated stations over 6.12 km, connecting the existing Aqua Line (Line 2) at Nal Stop to Line 4 at Manik Baug — effectively stitching Kothrud and Karve Road into the new corridor.

#StationArea / BeltCurrent price/sq ft (where data exists)
Nal StopKarve Road / Kothrud edge (interchange with existing Aqua Line)Established, high-value corridor; no fresh station-specific figure found
1Paud PhataKothrudNo organised listing data found
2Karve PutlaKarve Road beltNo organised listing data found
3Dhunkar ColonyKarve Nagar beltNo organised listing data found
4Karve NagarKarve Nagar₹9,000–15,400/sq ft, avg. ~₹11,750
5WarjeWarjeNo organised listing data found
6Daulat NagarWarje–Manik Baug stretchNo organised listing data found
Manik BaugTerminus, connects to Line 4See Line 4 table above

Karve Nagar is the one station on this spur with genuinely solid, recent price data — and it's already an established, fairly expensive micro-market, not an undiscovered one. Warje, despite being a real commuter suburb with a large population, doesn't show up with reliable aggregated price data in current portal listings, which is itself worth flagging rather than papering over with a guess.


What This Means for Prices Today — Be Honest About What You're Buying

No station on Line 4 or 4A has construction underway, so there is no "metro premium" being priced in yet — this is still a land-banking and long-horizon thesis, not a near-term catalyst. Anyone quoting you a specific appreciation percentage tied to Line 4/4A specifically is guessing, because the line doesn't have a confirmed construction start date, let alone an opening date.

Kharadi already shows a meaningful gap between Roomii's own locality range and a broader portal average — Roomii's Locality Price Index puts Kharadi at ₹7,000–10,500/sq ft, while a portal check in August 2026 showed a citywide average closer to ₹11,800/sq ft (up ~9.8% YoY). Neither figure is wrong; they're measuring different mixes of inventory across a large locality. The point for a buyer: don't anchor to a single portal's headline average for any of these areas — check the specific society and micro-pocket.

Magarpatta and Nanded City are already premium-priced townships, independent of the metro. Both show up with strong numbers (₹12,400–15,747/sq ft for Magarpatta, ₹12,150–12,900/sq ft for Nanded City) because of their own brand and amenity positioning — Cybercity's IT campus for Magarpatta, Kolte-Patil's township scale for Nanded City. A metro station arriving later is additive, but it's not why these areas are already expensive.

Hadapsar shows a wide gap between asking prices (₹14,500/sq ft) and registered/transacted rates (₹9,100/sq ft). That's a genuinely useful caution, not a metro-specific one: a lot of "hot area" pricing you see on portals is what sellers are asking, not what buyers are actually paying. Get registered transaction data before you believe a headline number for any of these localities.


The Line 3 Precedent: What Happens When a Line Actually Gets Built

If you want a preview of what Line 4/4A might eventually do to prices, the closest real comparison in Pune isn't a Phase 2 line — it's Metro Line 3, the Hinjewadi–Shivajinagar (Pink Line) corridor, because it's actually finished construction. As of this writing, the line was reported at roughly 94–95% physical completion, with the Hinjewadi–Baner stretch expected to open first and the fuller corridor targeted for around Independence Day 2026 — though the state government had not issued a formal, locked-in public launch date at the time of writing. If you're reading this after mid-August 2026, you likely already know whether that held.

What did happen to prices along that corridor while it was under construction is genuinely mixed, and worth reporting honestly rather than cherry-picked:

  • Roomii's own Locality Price Index (August 2026) already shows Hinjewadi at ₹7,800–12,500/sq ft with 13–16% YoY appreciation, and Wakad at ₹7,200–11,500/sq ft with 12–15% YoY appreciation — both the highest appreciation figures in that eight-locality index, and both areas Line 3 runs through directly.
  • Separately, portal-side estimates for Wakad specifically put 2026 pricing closer to ₹9,500–10,500/sq ft, with some sources citing anywhere from ~9% YoY to a much wider 15–25% range over the past year, depending on the source and exactly which stretch of Wakad is being measured.

The honest takeaway: Hinjewadi and Wakad both clearly outperformed most other Pune localities on appreciation while Line 3 was being built, but the exact number depends heavily on which source and which pocket of the locality you're looking at — and a meaningful chunk of that appreciation is also just IT-corridor demand, not metro alone. That combination — strong existing rental/buyer demand plus a metro line under construction — is what actually moved the needle, not the metro in isolation. Line 4/4A's stations mostly don't have that same existing demand base yet, which is the key difference an investor should weigh.


What Could Slip

Being upfront about risk here matters more than being upbeat about it:

  • India's metro construction timelines slip often, and Pune's own recent history proves it — Line 3 itself blew past a Diwali 2025 target and multiple earlier deadlines before nearing completion in mid-2026. A five-year window from a late-2025 approval is the Cabinet's stated commitment, not a guarantee.
  • Construction hasn't started, and "no earlier than 2026" is the most specific public timeline available. Land acquisition, utility shifting and tendering for actual civil contractors are the steps that usually cause the biggest real-world delays, and none of the coverage we found confirmed those are underway yet.
  • The funding split between the central government, state government and external agencies isn't publicly detailed, which matters because funding disbursement delays are a common source of construction slowdowns on Indian metro projects.
  • Two more extensions to this same network — Hadapsar–Loni Kalbhor (11.35 km, 10 stations) and Hadapsar Bus Depot–Sasvad Road (5.57 km, 4 stations) — have DPRs submitted but are not yet approved. If you're buying on the assumption the network keeps growing past Line 4/4A, that's a real possibility but not yet a sanctioned one.

The Roomii Verdict

If you're buying now specifically on a Line 4/4A appreciation thesis, be clear-eyed that you are betting on a five-to-six-year (at best) infrastructure delivery in a city where that has recently taken longer than promised. With that caveat stated plainly:

Kharadi Chowk is the strongest early-mover case on this list — not because of Line 4/4A alone, but because it's the one station on this entire 31.6 km corridor that already sits inside a proven, high-demand IT-driven market with its own independent growth story. A metro connection to Hadapsar, Swargate and eventually Khadakwasla adds a genuine new south/central-Pune commute option on top of demand that already exists.

Karve Nagar on the 4A spur is the second-best case — established, liquid, and gets a new direct link to both the existing Aqua Line (via Nal Stop) and the new Line 4 (via Manik Baug), effectively becoming a two-line interchange neighbourhood once both are live.

Dhayari and the broader Sinhagad Road stretch (Manik Baug, Nanded City) are the genuine long-shot, longer-horizon bets — currently the most affordable entry points on this corridor (₹5,350–7,200/sq ft for Dhayari specifically), in an area that's historically been underserved by rapid transit. If the line delivers on schedule, this is where the percentage upside is largest simply because the starting base is lowest — but it's also the area with the least existing price-data transparency, so go in with your eyes open.

Skip treating the old-Pune stretch — Rajaram Bridge, Deshpande Udyan, Dandekar Pul, Seven Loves Chowk, PCB, Race Course, Ramtekdi — as an investment thesis right now. These stations exist because the line needs to physically connect Khadakwasla to Kharadi through central Pune, not because these pockets are primed for large-scale residential redevelopment. There's essentially no organised price data here for a reason — treat any "metro premium" pitch for these specific stretches with real skepticism.

The honest bottom line: Line 4 and 4A clearing the Union Cabinet is a genuine milestone, not paperwork theatre — but "approved" is still years away from "operational," and Pune's own Line 3 just showed everyone how much that gap can stretch even after construction is well underway.

Browse verified flats in Kharadi on Roomii — 0% brokerage, direct owner connect, with MahaRERA registration surfaced on every listing where it's been provided.


FAQs

Is Pune Metro Line 4 the same as "Line 5" I've seen mentioned elsewhere? Yes, for this specific corridor. The Maharashtra state government approved this route in October 2024 under the name Line-5 and Line-5's Spur. When the Union Cabinet approved the same corridor for central funding in late November 2025, it was formalised as Line 4 (Kharadi–Hadapsar–Swargate–Khadakwasla) and Line 4A (Nal Stop–Warje–Manik Baug). Same physical route, different naming stage.

When will Pune Metro Line 4 and 4A actually open? There's no confirmed opening date. Construction is expected to start "no earlier than 2026," with a five-year construction period from the date of Cabinet approval (late 2025) — which points to a realistic completion window of roughly 2030–2031 if the schedule holds. Given recent Pune metro history, treat that as a floor, not a promise.

Which stations on Line 4/4A already have strong property price data? Kharadi Chowk, Magarpatta (South/Main/North), Nanded City, Swargate North and Karve Nagar are the stations with the most reliable current price data, mostly because these are already established, actively traded micro-markets independent of the metro. Roughly half the remaining stations — much of the old-Pune and cantonment-adjacent stretch — have no organised price data at all.

Should I buy property now anticipating Line 4/4A appreciation? Only with realistic expectations. This is a five-plus-year infrastructure bet in a city where metro timelines have slipped before, and construction hasn't started. Areas with existing independent demand (Kharadi, Karve Nagar) are more defensible bets than areas where the metro would be the only reason to expect appreciation (much of the old-Pune stretch).

Did property prices near Metro Line 3 actually go up while it was being built? Directionally yes — Hinjewadi and Wakad both show among the highest YoY appreciation figures in Roomii's own Locality Price Index (13–16% and 12–15% respectively), and both sit directly on the Line 3 corridor. But the exact numbers vary meaningfully by source, and strong pre-existing IT-corridor demand was very likely doing much of that work alongside the metro, not the metro alone.

Filed underFuture PunePune Real Estate2026 Guide